— Frame scaffolding
Frame scaffolding with all certifications
It is ideal for plastering, painting, thermal insulation, installing cladding and facades, masonry, restoration and general maintenance work.
It is a suitable choice for engineering and construction companies, building contractors, plastering and painting crews, insulation and renovation companies, as well as residential, commercial and industrial projects.

/ Function and benefits
Ideal for simple facade and painting work, plastering, thermal facades and building maintenance
Easy and fast assembly and disassembly
Low material and installation cost
High level of mobility
Advantages
/ Components
All components for assembling frame scaffolding are made with hot-dip galvanizing. At our company you will find:
Frames (vertical and protective)
Braces (horizontal and diagonal)
Platforms and ladders
Wall anchors, tubes, guardrails, starter bases, base jacks, extension brackets, clamps, etc.
All the necessary components
Frame scaffolding specifications
Frame (H-type) scaffolding is built from 2 m vertical frames and 2.5 m bays. Each working platform is about 65 cm wide, with two 2.5 m × 32 cm metal planks per bay. Access is by 2.5 m × 64 cm platforms with a built-in metal ladder.
2 m vertical frames, 1 m frames and L-frames for the top level
2.5 m horizontal braces (handrail and mid-rail) and diagonal braces
2.5 m × 15 cm toe boards and side guardrails
Base jacks, starter bases, tube wall anchors and 48.3 mm clamps
All components are hot-dip galvanized to EN ISO 1461, and the system is certified to EN 12810 / EN 12811 with CE marking. Every order comes with the structural technical file required on public and private projects.
How much scaffolding you need and what it costs
A facade 30 m long and 10 m high (300 m²) needs about 360 components. Our ready-made 300 m² package costs €8,100.90 + VAT. Packages from 100 to 1,000 m² are in the offers catalogue. For your own dimensions, the scaffolding calculator lists the components and the price in a minute.
Frequently asked questions
How is it different from Ringlock scaffolding? Frame scaffolding is more economical and faster to erect on straight facades. Ringlock scaffolding suits curves, corners and industrial projects.
How fast can I get it? Orders are ready 2–3 days after confirmation. We ship throughout Greece, or you can collect from our warehouse in Thessaloniki.
Do you sell individual components? Yes, every component is also sold separately, for example to extend existing scaffolding.
